Արևային կայան բիթքոյնի արտադրությունում

Dzoraxbyur

|

200 kw

Power

200 kW solar power plant for a mining farm

Crypto manufacuring involves enormous electricity costs. Organizations engaged in this activity are most eager to install energy-saving equipment.

Eco Step has installed a PV plant in one of the crypto companies in Dzoraghbyur, which will produce more than 300 000 kw electricity per year.

 

The crypto company will have more than  15 000 000 AMD savings per year. Isn’t this good for the business?

To guarantee solar PV’s best productivity, Eco Step has installed Solis inveters, which are included in the best Tier 1 solar companies.

However, as always, we’ve satiated the system with full protection systems, like grounding, DC and AC protection systems and DC switch.