Yerevan
|
40 kW
Altech Group. Solar station from Eco Step
A 40kW solar power plant was installed for the partner with special preferential financing terms from Arm Leasing, so that energy efficiency is accessible without large investments. Thanks to the solar plant, the company has saved 50% of its annual electricity costs and plans to zero it out by the end of the year, continuing its cooperation with Eco Step.
The result: sustainable energy, financial savings and a step towards a green future.
What does Altech Group do?
The company carries out extensive production activities in the Armenian market. Altek Group mainly specializes in metal-plastic and aluminum doors and windows, as well as facade systems and partitions, offering high-quality products that meet European standards.
For over 5 years, Altek Group has also been engaged in construction and road building.
It’s time to save
More than 2 000,000 AMD saved annually for the business. The company achieved this result with the help of installed solar systems.
Wouldn’t you like to do the same?
Fill in your details below, and our specialist will contact you with the best solar PV system offer in terms of price and quality.